Environmentally friendly, cost-effective, modular bund/secondary containment system
Regulations state that above-ground oil storage tanks must have secondary containment. Site operators have a duty of care to prevent hydrocarbon leaks from equipment such as transformers and fuel storage tanks — as well as other contaminants such as chemicals, fertiliser and milk — from entering the ground and polluting the environment.
ReBund® offers a flexible, robust, cost-effective, environmentally friendly and easy-to-install solution, built primarily from nonporous, durable, 100% post-industrial recycled plastic waste that would otherwise go to landfill.
Customers enjoy additional peace of mind with a ReBund® 20-year warranty at no extra cost. Terms apply.
Modular design makes it easy to transport and quick to install
No need for major plant equipment — can be quickly assembled on site by a team of two
20-year warranty at no extra cost
Minimal ground penetration
Ideal for new build and retrofit
Low material and maintenance cost compared to traditional all-concrete bund
Lower labour costs — faster installation than traditional methods
Reduced carbon footprint compared to all-concrete construction
Made from nonporous, durable, 100% post-industrial recycled plastic waste with steel-pipe reinforced posts and panels for added strength
Reduces the amount of plastic sent to landfill
Can be installed on most surfaces
Can be adapted to most shapes and sizes, saving space that could otherwise be wasted
Installation sealed with Andel's quick-drying Cold Fusion Liquid Membrane for 100% guaranteed liquid retention
Suitable for containing hydrocarbons as well as a range of other pollutants
Provides four hours' fire resistance in tests
Installation is easy, with no requirement for major plant equipment and no need to suspend core site operations during installation.
ReBund® is a modular system that can be quickly assembled on site by a team of two people with minimal ground disturbance. Wall section panels and posts are installed like standard garden fencing, and key base slabs are mounted on beams onto a prepared surface like laying flagstones. All internal surfaces are sealed with Andel quick-drying Cold Fusion Liquid Membrane for guaranteed 100% liquid retention.
Both options are sealed with the Andel Cold Fusion Liquid Membrane system for guaranteed 100% liquid retention.
ReBund® panels, posts and base slabs are primarily made from 100% post-industrial recycled plastic waste. ReBund® turns the longevity of plastic — usually a serious environmental problem — into an environmentally friendly, cost-effective and robust pollution-prevention solution. It not only reduces the amount of plastic sent to landfill, it also reduces your carbon footprint compared to a traditional all-concrete bund construction.
For the manufacture and installation of a typical 6m³ bund wall:
More information is available on request.
ReBund® recycled content consists of LDPE, HDPE, PP and other plastics, providing resistance to weather, UV, chemicals, temperature, impact and moisture. Panels and posts are fitted with steel-pipe reinforced rods for added strength.
Posts fit into a steel base plate that is bolted deep into a concrete foundation with chemical M16 stainless-steel anchors that bond with the concrete to provide the highest level of structural strength.
Andel's fast-cure, waterproof, liquid membrane coating system is applied to the inside of the bund. Using a primer layer, a membrane with fleece layer and a topcoat, the system provides high resistance to the elements. Topcoats can be tailored to resist a range of contaminants, and the system provides 100% guaranteed liquid retention.
Note
Fire resistance: tests show that after four hours of constant exposure to a flame at the ignition temperature of transformer oil, neither the Cold Fusion membrane nor the ReBund® panel exhibited any structural or impermeability integrity issues.
ReBund® can be installed on most surfaces, from soft ground to asphalt to concrete. The modular nature of the system means it can be adapted to fit around irregular shapes, potentially freeing up space that would otherwise be wasted.
Product code: RB.
20-year warranty at no extra cost. Terms apply (subject to the product being used and maintained in accordance with Andel's recommendations and user guidelines).
Specifying at design stage? Learn how to specify oil storage maintenance and compliance correctly with an accredited CPD session, delivered by Andel engineers.